Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Histon and Impington Active Travel:

  • Social Media Hostility

    Created by jack // 1 thread

    I have noticed that especially since the congestion charge there has been a lot of aggression towards Camcycle in social media comments. Notably on Facebook, Nextdoor, etc. I am aware that angry aggressive people have always been on the internet but I do feel the level has increased since congestion charge notoriety, with many people's opinions degenerating into conspiracy theories about Camcycle and the council.

    I do worry about the effect this can have on increasing "us vs them" mentality and increasing aggressive behaviour towards cyclists on the road.

    Please sign in to vote.
  • Long wait to cross Busway / Station Road, Histon

    Created by Matt H // 1 thread

    Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.

    This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!

    Please sign in to vote.
  • Guided busway hazard

    Created by Philip // 1 thread

    Sunday 26th of September 10.15pm I was cycling from Cambridge North to Histon.  I collided with a fence immediately after exiting the A14 tunnel and sustained a dislocated shoulder along with other injuries.

    There is definitely a hazard here because 

    1) the busway and tunnel from Cambridge North are brightly lit.  The busway after the tunnel towards Histon is unlit.  

    2) about 30m after the tunnel the width of the busway tarmac surface suddenly reduces due to the introduction of the gravel strip (approx 1m wide).  There is also a fence near the start of the gravel strip (I assume for the small animal tunnel)..

    I cycled through the tunnel and noticed a cyclist coming in the opposite direction (without lights), so I took avoiding action by moving to the left.  I may have then glanced at my mobile phone on my handlebars.  When I looked up I saw the fence in my headlight.  I then hit or clipped the fence.

    Please sign in to vote.
  • Cambridge Science Park North

    Created by Roxanne (Cycling Campaign Officer) // 1 thread

    https://www.cambridgesciencepark.co.uk/cambridge-science-park-north/

    Trinity College has begun to consult on a proposal to transform a parcel of adjacent agricultural land to the east of Histon and Impington into Cambridge Science Park North. The proposal is at early stages with a submission having been made into the Call for Sites process which forms part of the Greater Cambridge local plan

    Science Park North will be created on land which is currently used for farming, but is located close to the Park and Ride and the waste transfer site which are both accessed from the A10.

    It is located close to the Area Action Plan land to the east and the Project Team is working closely with AAP Members on a number of areas which are of mutual interest. It is anticipated that the timescale for the AAP process will match the development timescale for the Greater Cambridge Local Plan and the CSP North timetable is planned to complement this.

    CSP North is also located close to Cambridge Regional College, which sits between the existing science park and the proposed expansion land.  Discussions are underway with CRC  with the ambition of providing facilities for greater collaboration in the future which could be in the form of expansion but also education and work apprenticeship schemes for future students of the CRC.

    The transport strategy for Cambridge Science Park North is targeted at complementing the improvement plans for the existing science park. The initial aim is to ensure that there is no increase in car use across the two sites, with a medium and long-term target of reducing car usage across the two sites completely.

    The early ideas are to provide a consolidated space for parking which will serve both Science Park sites, which will be linked to a mobility hub providing pedestrian, cycling, autonomous vehicle and sustainable mass transit facilities for onward travel.  These will utilise existing infrastructure such as Mereway Cycle Route and the Guided Busway as well as proposed infrastructure such as The CAM.

    These proposals will improve access to the whole of Cambridge, reducing current traffic on the Milton Road by providing a hub serving the wider AAP area including access to Cambridge North Station. 

    Please sign in to vote.
  • Map of planned projects

    Created by wookey // 2 threads

    It's hard to know where (and when) all the future cycling-related developments are, so a map showing them could be very useful. This issue is to discuss this idea, if it is useful, or already exists somewhere, and how it might be done.

    Please sign in to vote.
  • 20/03742/FUL Kendal Court flats, Impington.

    Tom McKeown // 1 thread

    Demolition of existing buildings comprising Anglia House, Kendal House inc. flats above, Regency House and Marble Store to rear and 1 Cambridge Road inc. flats above; redevelopment of the site comprising 28 new-build Class C3 residential units, and associated parking, 2no. A1 use class commercial units at ground floor level, inc. 2no. commercial parking parking spaces; proposed new landscaping and public realm improvements to Cambridge Road.

    Land Comprising, Kendal Court, Anglia House, Kendal House, Regency House And 1 Cambridge Raod Cambridge Road Impington Cambridge CB24 9YS

    Cambridge

    Application reference : 20/03742/FUL

    Please sign in to vote.
  • 20/03802/FUL Orchard Park - 75 dwellings

    Created by Matthew // 1 thread

    Residential development of 75 dwellings along with access, car parking, landscaping and all associated infrastructure

    Development Parcel L2 Topper Street Orchard Park Cambridge Cambridgeshire

    Cambridge

    Application reference : 20/03802/FUL

    Please sign in to vote.
  • Retirement Homes on Barrell Feild, Histon

    Tom McKeown // 1 thread

    Redevelopment of land off Home Close and within the boundary of the Hain Daniels Group factory, in Histon, Cambridge, CB24 9NR. McCarthy & Stone’s initial plans propose to redevelop the site with Retirement Plus (Extra Care) accommodation with 65 apartments, 36 bungalows and seven cottages, all set within attractive landscaped gardens and with 45 on-site car parking bays.

    A virtual consultation is available at https://mccarthyandstoneconsultation.co.uk/histon/proposals/ between Wednesday 16th September – Wednesday 23rd September 2020, looking for community feedback ahead of formal planning application.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top